توضیحات
ABSTRACT
This study describes the application of the developed model to the scheduling of the Robotic Flexible Assembly Cells (RFACs).The present study is a continuation of the paper titled “Development of a Fuzzy-Simulation Model of Scheduling Robotic Flexible Assembly Cells”.This new model for multi-objective scheduling problems in RFACs was based on combining a fuzzy-based mathematical model with simulation software tools. In this study,a hypothetical case study of RFACs is presented to demonstrate the effectiveness of the developed model and then compare the results that are obtained by the new methodology with the common scheduling rules.The simulation results show that the performance of the proposed methodology outperforms the most popular scheduling rules from previous research.
INTRODUCTION
Due to increasing competition in the developing global economy, today’s companies are facing greater
challenge than ever to employ Flexible Manufacturing Systems (FMS)capable of dealing with unexpected
events and meeting customers’ requirements.Therefore,FMSs have attracted significant attention by both researchers and industrial practitioners in recent years.One class of such systems is called Robotic Flexible Assembly Cells (RFACs).
Year:2013
Publisher: Journal of Computer Science 9
By:Khalid Abd, Kazem Abhary and Romeo Marian
File information: English Language / 9 Page / Size 247 KB
Download : click
سال:2013
ناشر:Journal of Computer Science 9
کاری از:Khalid Abd, Kazem Abhary and Romeo Marian
اطلاعات فایل: زبان انگلیسی/ 9 صفحه/ حجم 247 کیلوبایت
لینک دانلود : روی همین لینک کلیک کنید
نقد و بررسیها
هنوز بررسیای ثبت نشده است.